| /

Notify me when this product is available:

TOAKS Titanium Backpacking Wood Burning Stove is an Outdoors Industry Award Winner. The Titanium Backpacking Wood Burning Stove is compact, lightweight,  durable and easy to carry – weighs only 7.9 oz / 225 g. Made of titanium. Comes with a mesh storage sack. A great product for outdoor cooking, poykes, BBQs and camping. 

Details:

  • Received Outdoor INDUSTRY AWARD 2015 Friedrichshafen, Germany.
  • Compact and lightweight, very easy to use, and of high efficiency.
  • The stove comprises of three parts, which can be stacked into each other and packed for easy storage.
  • Based on the flow field calculation of the optimized gas intake, the stove’s high efficiency is achieved because of its 2nd and 3rd combustion mechanism of the wood and the wood gas.
  • This stove can be nicely packed into TOAKS Titanium 1100ml Pot or 1600ml Pot to form a complete cooking system. If you want to add a drinking cup, TOAKS Titanium 450ml or 375ml Cup can nest into this stove set.
  • Perfect for outdoor cooking and camping.

Specifications:

  • Material: Titanium Weight: 7.9 oz (225g)
  • Dimension: 4 1/8″ (D) x 4 1/8″ (H) (105mm x 105mm) (Packed) 4 1/8″ (D) x 8″ (H) (105mm x 205mm) (Assembled)
  • Internal space when packed: 94mm (D) x 100mm (H)